Wednesday, August 27, 2014

SAP C A1FIN 10 Certification Exam Material - Free Download and Guaranteed Pass

SAP C A1FIN 10 Certification Exam Material - Free Download and Guaranteed Pass



Exam code : C_A1FIN_10

Exam name : SAP Certified Application Associate - Financials with SAP Business All-in-One Solution Exam



The ASAP Focus Methodology defines a proposal framework as an accelerator to help you

produce the proposal document during the evaluation phase.

Which document is part of the proposal framework?

A. Sales presentations

B. Marketing collateral

C. Customer qualification questionnaire

D. Solution scope document

Answer: D

During the preparation phase, you create a project charter and define project standards

and procedures. These elements give the project manager the authority to conduct a

project within scope, quality, time, and cost and resource constraints.

Which approach would you recommend for scope change requests?

A. Since the project is a fixed scope project, reject all scope change requests.

B. Only accept scope change requests after integration and acceptance tests.

C. Collect scope change requests and hand them over to development immediately.

D. Document scope change requests according to the change requests plan and decide on

realization.

Answer: D

When a document is posted, a number is assigned to that document.

Where does this number come from?

A. Document source

B. Document area

C. Document type

D. Posting key

Answer: C

SAP Best Practices are preconfigured packages that can be used for different purposes in

various phases of an implementation project.

Why would you set up a system by activating an SAP Best Practices package?(Choose

two)

A. To introduce new functions that are not offered in the Business Suite

B. To accelerate the implementation of SAP applications

C. To quickly set up a prototype system for specification workshops, trainings, and demos

D. To correct settings in a productive system

Answer: B,C

Which components are part of the SAP Business All-in-One solutions?(Choose three)

A. Preconfigured business processes

B. Help portal

C. NetWeaver Business Client

D. Documentation and training material

E. GuiXT

Answer: A,C,D

Which "additional" planning method is available for internal orders if you have information

about sources of supply and vendors' prices based on quantities?

A. Unit cost planning

B. Activity input planning

C. Overall planning

D. Primary cost planning

Answer: A

How do you use the Solution Builder to package your own solution?(Choose two)

A. Add a Customizing step to your building blocks using a report.

B. Use solution builder to automatically transfer a solution into a new scenario map.

C. Export the structure of your solution into an xml file.

D. Create building blocks that contain your delta settings.

Answer: C,D

Along with SAP NetWeaver Business Client (NWBC), SAP provides a NWBC demo kit for

partners. This contains the welcome page and workbenches to enhance the user interface.

What are the required steps to install and run the NWBC demo kit?(Choose three)

A. Configure the user interface according to your specific needs.

B. Import the transport request from the NWBC demo kit into your system.

C. Download the NWBC demo kit from the SAP Help Portal under alias /bestpractices.

D. Download the NWBC demo kit from the SAP Service Portal under alias /bestpractices.

E. Order the NWBC demo kit per OSS message with reference to SAP Note 1040010.

Answer: A,B,D

No comments:

Post a Comment