Exam code : CTFL
Exam name : Certified Software Tester - Foundation Level (CSTFL)
You are working as a test manager in the medical domain leading a team of system
testers. You are currently working on a major release of the product which gives customers
many new features and resolves a number of problem reports from previous releases.
You are about to release a test progress report to a senior manager, who is not a test
specialist. Which of the following topics should NOT be included in the test progress
report? 1 credit
A. Product risks which have been mitigated and those which are outstanding.
B. Recommendations for taking controlling actions
C. Status compared against the started exit criteria
D. Detailed overview of the risk-based test approach being used to ensure the exit criteria
to be achieved
Answer: D
Explain how the above mentioned report may differ from a report that you produce for the
project manager, who is a test specialist Select TWO items from the following options that
can be used to report to the project manager and would not be included in a report to
senior management. 1 credit
A. Show details on effort spent
B. List of all outstanding defects with their priority and severity
C. Give product risk status
D. Show trend analysis
E. State recommendations for release
Answer: A,B
Consider the typical objectives of testing. Which of the following metrics can be used to
measure the effectiveness of the testing process in achieving one of those objectives? 1
credit
A. Average number of days between defect discovery and resolution
B. Percentage of requirements covered
C. Lines of code written per developer per day
D. Percentage of test effort spent on regression testing
Answer: B
You have been given responsibility for the non-functional testing of a safety-critical
monitoring & diagnostics package in the medical area. Which of the following would you
least expect to see addressed in the test plan? 1 credit
A. Availability
B. Safety
C. Portability
D. Reliability
Answer: C
Since the system is in the medical domain and therefore in the safety critical area, testing
needs to be rigorous and evidence is required that the system has been adequately tested.
Identify THREE measures that would typically be part of the test approach in this domain
and which are not always applicable in other domains! 1 credit
A. High level of documentation
B. Failure Mode and Effect Analysis (FMEA) sessions
C. Traceability to requirements
D. Non-functional testing
E. Master test planning
F. Test design techniques
G. Reviews
Answer: A,B,C
A test log is one of the documents that need to be produced in this domain in order to
provide evidence of testing. However, the level of detail of test logs can vary. Which of the
following is NOT an influencing factor for the level of detail of the test logs being produced?
1 credit
A. Level of test execution automation
B. Test level
C. Regulatory requirements
D. Experience level of testers
Answer: D
Considerable attention will be given in this project to defining exit criteria and on reporting
back on their status. Which combination of TWO exit criteria from the list would be best to
use? 1 credit
I. Total number of defects found
II. Percentage of test cases executed
III. Total test effort planned versus total actual test effort spent
IV. Defect trend (number of defects found per test run over time
A. (i) and (ii)
B. (i) and (iv)
C. (ii) and (iii)
D. (ii) and (iv)
Answer: D
Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its
test process. Currently, most of their testing resources are focussedon system testing.
They are developing embedded software, and do not have a simulation environment to
enable them to execute software modules on the development host. They have been
advised that introducing inspections and reviews could be the most appropriate step
forward.
Identify the THREE types of formal peer reviews that can be recognized. 1 credit
A. Inspection
B. Management review
C. Walkthrough
D. Audit
E. Technical review
F. Informal review
G. Assessment
Answer: A,C,E
As part of the improvement program, the organization is also looking at tool support. Which
type of tool could be used to ensure higher quality of the code to be reviewed? 1 credit
A. Review tool
B. Test execution tool
C. Static analysis tool
D. Test design tool
Answer: C
What is the main reason why reviews are especially beneficial in the above-mentioned
scenario? 2 credits
A. They ensure a common understanding of the product.
B. They find defects early.
C. They enhance project communication.
D. They can be performed without exercising the code.
Answer: D
The introduction of reviews and inspections has often failed as a process improvement
action. Identify the THREE most important measures that should be taken to reduce the
risk that this test process improvement will fail. 2 Credits (for 2 out of 3 correct 1 credit)
A. Process ownership and experienced moderators who drive the inspection process.
B. Management support
C. Training of those involved
D. The availability of stands and processes
E. Usage of a more traditional software development lifecycle
F. Alignment with software process improvement
G. Using a reference model, e.g. TMMi
Answer: A,B,C
IEEE 1028 also defines “management review” as a type of review. What is the main
purpose of a management review? 1 credit
A. Align technical concepts during the design phase
B. Establish a common understanding of requirements
C. Provide independent evaluation of compliance to processes, regulations, standards etc.
D. To monitor progress, assess the status of a project, and make decisions about future
actions
Answer: D
Which of the following is an example of testing as part of the requirements specification
phase? 1 credit
A. A requirements review meeting
B. A business analyst eliciting requirements
C. Performing acceptance tests against requirements
D. A test report showing requirements coverage
Answer: A
Topic 3, Scenario 3 "Tool Selection and Implementation"
Your company is considering whether or not to purchase a test tool suite from a
respectable vendor. Your manager has searched the internet for comparable products but
none of them meets his specific requirements. A tool demonstration has been arranged for
next week and your team has been invited to attend. The tool suite consists of a test
management tool, test execution tool and a requirements management tool. There is the
possibility of adding a performance testing tool at a later stage. You have decided to attend
the demo but raise some issues beforehand regarding expectations.
Select THREE issues from the options provided that should at least be raised. 1 credit
A. Has there been sufficient comparison of tools?
B. What are the problems we are trying to address?
C. Do we have a set of tool requirements to validate the tool against?
D. How will the implementation be organized?
E. Which project will be selected to perform the tool pilot?
F. Is customized training available?
G. How will the change process be managed?
Answer: A,B,C
Which of the following would you least expect to form part of the analysis of initial tool
costs? 1 credit
A. Integration with other tools
B. Learning time required to use the new tool
C. Tool portability
D. Evaluation of suitable tools
Answer: C
Topic 4, Scenario 4, V2 "Test Management Tool"
The project situation after 11 months is:
- The first increment was released one week late but contained sufficient functionality to be
declared fit for purpose'. However, there were 20 outstanding incidents deferred to
increment two.
- The amount of voluntary overtime worked PV the test team has reduced the second
Increment slippage to just 3 weeks.
- There is talk of reducing the scope of requirements. The purpose of this is to first deliver
the application with support for manual testing and then to provide a delivery * weeks later
to resolve any remaining points and provide support for automated testing (i.e. the link to
the capture-replay tool).
- Concerns have been expressed by a section of the user community, that in some places
the usability is very poor.
Which of the following are valid reasons for adopting a different life cycle (from the V
model), for increments after the first year? 2 credits
i. We do not have a clear understanding of the requirements from a customer perspective.
ii. We see the risk of delivering requested functionality late as being higher than the risk of
delivering a lower quality product.
iii. We do not have a budget for additional regression testing which is needed to ensure that
existing functionality is not compromised by future iterations.
iv. The company test strategy does not fit well within the V life cycle model.
A. (i) and (ii)
B. (i) and (iv)
C. (ii) and (iii)
D. (ii) and (iv)
Answer: A
Which of the following is a characteristic of good testing in any life cycle model? 1 credit
A. Analysis and design of tests begins as soon as development is completed.
B. Some, but not all, development activities have corresponding test activities.
C. Each test level has test objectives specific to that level.
D. All document reviews involve the development team.
Answer: C
Which of the following would you expect to see in the master test plan? 1 credit
A. A description of how the test cases are cross-referenced to requirements in the test
management tool.
B. A detailed identification of the resources that will carry out structural testing in the first
iteration.
C. The test approach that will be applied at system integration testing.
D. A list of the names of the testers who will carry out the performance testing for the final
iteration.
Answer: C
Which of the following would be the most significant input to estimating the time to carry out
the specified testing tasks? 3 credits
A. The skills and experience of developers to correct the failures.
B. The standards used for the requirements specification.
C. The metrics recorded from testing the capture-replay tool.
D. The number of testers in the company and their grade.
Answer: C
Which of the following would be the TWO most appropriate examples of entry criteria
documented in the system integration test plan? 2 credits
A. The percentage of decision coverage achieved during unit testing.
B. The availability of the latest version of the capture-replay tool (for testing the interface
with the newly developed test management tool).
C. The sign-off of a performance test software release note (test item transmittal report) by
both development and testing showing that system performance meets the specified
acceptance criteria.
D. The percentage of acceptance test procedures scheduled for execution.
E. The percentage of requirements coverage achieved during system integration test.
Answer: A,B
Which test management control option is most appropriate to adopt under these
circumstances? 2 credits
A. Introduce mandatory evening and weekend working to retrieve the 3 week slippage.
B. Reconsider the exit criteria and review the test plan in the context of the current
situation.
C. Advise the user community regarding the reduced scope of requirements and the
additional incremental delivery.
D. Arrange a meeting with the user community representatives to discuss the user
interface.
Answer: B
Risks should be constantly reviewed. Given the current situation, which one of the following
factors is most likely to lead to a revised view of product risk? 3 credits
A. The concerns over the user interface may lead to changes to the interface which cannot
be implemented by development in time for the second test iteration.
B. The concerns over the user interface raises the likelihood of a risk in that area and
increases the amount of test effort needed for the user interface, thereby limiting the test
effort available for other parts of the test management tool.
C. The delivery of the application without the interface changes may upset the user
community.
D. The method used for test estimation is not accurate enough and hence the money spent
on testing exceeded its budget.
Answer: B